Service, Solutions, ingenuity 479.646.2901

Projects - Industrial

Graphic Packaging International, New Manufacturing Facility

Fort Smith, Arkansas

The 349,000 square-foot design-build project utilized pre-engineered long bay steel-framing and concrete tilt wall panels. Masonry bearing structural steel supported concrete mezzanine area of 20,000 square-feet was also constructed for office and storage space. GPI, Inc. had a need to fast track the project to full capacity before the critical production date.  Because SSi has the ability to self-perform over 40% of the project’s time critical and labor intensive construction, the project was completed on budget in eight months.